Aero Projects and Move Timetable

The department continues to invest in new and refurbished facilities and laboratories as we prepare for the move. The headline big projects currently underway include

  • Refurbished 10×5 (formerly Honda) wind tunnel
  • New T1 and T2 wind tunnels in the CAGB building to replace the old 3×3 and Donald Campbell wind tunnels
  • New Flight Simulator located in CAGB to replace the present Motus Simulator
  • New Mach 5 Supersonic wind tunnel
  • New Flight Arena building at the back of CAGB (visible from Dalby Court) for Aerial Robotic teaching and research

Below is the latest timetable for these projects

aero_timetable

Leave a Reply

Your email address will not be published. Required fields are marked *